CASE STUDY
ROAD DRAINAGE BASIN BACKFILL

640 Tonne For backfill

POSITRACK ROCKSLINGER
2 x Positracks for approx
5 days @ 10 hour days to backfill basin.
Plus 1½ days for excavator to topsoil batters.
One 10 hour day to backfill basin.
Topsoil batters on same day.
Total Cost of $7,200 (ex GST)
and 7 Days
Total Cost of $5,500 (ex GST)
and 1 Day

Total saved by Rockslinger - $4,400 (ex GST) and 6 Days



 



   